Cabinet finishing

Jan 18, 2017

Leave a message

1. preparation

Must first notify the user without affecting user sorting cabinets under normal working conditions.

Then based on network topology, available equipment, number of users, user groups and other factors outlined within the Cabinet line charts and equipment locations.

Next prepared materials needed: Web jumper, labels, various types of plastic cable ties (strangled dogs).

2. organize cabinets

Cabinet installation:

Need to do the following three things: first, use the random box with screw and nut tightening up the cage and, secondly, the Cabinet down, wheel placement activities; and, third, adjusted according to the location of the device in the retention and add baffle.

Finish lines:

The cable group, group number is usually less than or equal to the number behind the cabinet frame. All devices power cord bundled together, remove plug from the back of the line after insertion, by having a separate cable looking for their equipment.

Fixed equipment:

The Cabinet bezel adjustment into place, allowing administrators to no power doors you can see all the functioning of the device, while depending on the number and size of the device properly to add the bezel. Note to leave a gap between the bezel. Cabinets all use of switching equipment, routing equipment in accordance with the drawing of the figure placed in advance.

Cable labeling:

After all the network cable is connected, the cable needs to be identified, clinging to network cable will be ready for the post, and on which the pen to mark (usually indicating the room number or for what purposes) and logo should be simple and easy to understand. Crossover cable you can use different colored sticky with the general distinction between wire. If the device is too much, then to classify the device number, and device labeling.

3. the late work

UMC test:

When sign-out, power, Internet connectivity test to ensure the user's normal work--this is the most important.