Network cabinet arrangement steps
1. Preliminary preparation
First, inform the user to tidy up the network cabinet without affecting the normal work of the user.
Then, according to the network topology, existing equipment, number of users, user grouping and other factors, draw the line routing diagram and equipment location diagram inside the network cabinet. Next, prepare the required materials: network jumper, label paper and various types of plastic ties.
2. Organize the network cabinet
To install the network cabinet, the following points should be completed: first, use the screws and nuts of the random frame to tighten the fixing frame; Second, pull down the network cabinet and install the movable wheel; Third, adjust and add baffles on the fixed frame according to the position of the equipment.
Arrange the line:
Group the network cables. The number of groups is usually less than or equal to the number of cable racks behind the network cabinet. Bind the power lines of all equipment together, insert the plug from the rear through hole, and find their respective equipment through a separate wire management rack.
Fixed equipment:
Adjust the baffle in the network cabinet to an appropriate position, so that the administrator can see the operation of all equipment without opening the network cabinet door, and add the baffle appropriately according to the number and size of equipment. Pay attention to leave a certain gap between the baffles. Place all switching equipment and routing equipment used in the network cabinet according to the pre drawn drawing.
Cable labeling:
After all network cables are connected, each network cable shall be identified, the prepared instant stickers shall be wound on the network cable and marked with a pen. The identification shall be simple and easy to understand. The cross network cable can be distinguished from the general network cable by using instant stickers of different colors. If there are too many equipment, the equipment shall be classified, numbered and labeled.