1. Fix the distribution frame in place, install the slot on the back, and print the panel paper distribution frame (or stick on the distribution frame) on the front. If the module of the distribution frame can be replaced, you should cancel the module;
2. Positioning of cable management board
3. Threading the management board
4, routing cable
5, wire harness fixed
6, curved line
7, lead management
8. Take the exited cable management board back to the cable inlet, use the next 24-port patch panel's cable management table, and repeat 1-8 in order to complete the cable management of the next bundle of cables until all is completed.